Requirements
Control the engineering baseline
Capture requirements, manage exact versions and baselines, configure project attributes and track maturity as the project evolves.
SeiaWorks connects requirements, V&V, controlled procedures, electronic execution, objective evidence, Issues, RAM and Safety in one traceable project assurance record.
Traceable
Requirement to evidence
Controlled
Revisions and baselines
Field-ready
Electronic execution
Granite Valley LRT
Project Assurance Overview
86%
Req. Approved
91%
V&V Coverage
74%
Activities
Assurance by system
Upcoming witness points
12
Evidence review
Assurance trace
Built around the assurance lifecycle
SeiaWorks connects the requirement baseline to V&V, execution, evidence, issue closure, RAM and Safety while keeping the engineering relationships visible.
Requirements
Capture requirements, manage exact versions and baselines, configure project attributes and track maturity as the project evolves.
Traceability
Maintain controlled requirement relationships and follow decomposition, allocation, derivation and impact across large project baselines.
V&V
Use a lifecycle RTM that links requirements directly to controlled procedure capture, execution evidence and verification decisions.
Execution
Run approved procedures electronically with measurements, acceptance criteria, photos, attachments and preserved retest history.
Issues & FRACAS
Manage issues, corrective action and failure analysis without separating genuine failure events from the engineering issue lifecycle.
RAM
Combine controlled RAM criteria, exposure and chargeable failure populations into transparent reliability and maintainability assessments.
Safety
Manage hazards, controls, risk assessments, evidence, independent review and formal acceptance in one controlled lifecycle.
Witness & Hold
Track project-defined parties, notice periods, invitations, attendance and formal hold-point releases.
End-to-end traceability
Keep the controlled relationship between what was required, how it was planned to be verified, what was actually executed and the evidence that was produced.
Explore platform featuresRequirement
V&V
Activity
Procedure
Execution
Evidence
Verification
The result
A defensible, reviewable project assurance record.
Electronic commissioning
Execute the exact approved revision, capture typed results and measurements, collect evidence at the point of work and preserve every retest attempt.
Instructions, acceptance criteria, limits, units and response types.
Automatic pass/fail for measurements and controlled responses.
Capture photos and attachments directly against the test step.
Preserve failed attempts and link subsequent passing executions.
Electronic execution
SAT-TP-001 · Execution #2
DC bus voltage
Acceptance: 730–770 V DC
Recorded: 748 V DC
Feeder breaker local operation
Acceptance: Operates correctly
Recorded: Pass
SCADA breaker operation
Acceptance: Command + indication
Recorded: Pass
Execution → V&V evidence
Completed execution becomes a reviewable evidence package.
Step results, photos and attachments remain linked to the requirements they support.
One project record, different perspectives
SeiaWorks is being shaped around the real participants in complex infrastructure assurance, while keeping project-controlled access and authority boundaries explicit.
See what is ready, what needs testing, which procedure applies, what failed and what evidence was captured.
Maintain traceability from requirement through verification method, activity, execution and objective evidence.
See requirements maturity, V&V coverage and assurance delivery by system, activity and location.
Structured for future controlled access to upcoming testing, witness points, dashboards and narrowly scoped review actions.
Witness & hold point management
Project-defined assurance parties and point types support notification tracking, optional witness attendance, formal hold releases and a central view of upcoming stakeholder involvement.
Engineering clarity. Delivered.
Designed for complex infrastructure projects where traceability, controlled execution and visible progress matter.