Project assurance, connected

From requirement to field evidence.One assurance platform.

SeiaWorks connects requirements, V&V, controlled procedures, electronic execution, objective evidence, Issues, RAM and Safety in one traceable project assurance record.

Traceable

Requirement to evidence

Controlled

Revisions and baselines

Field-ready

Electronic execution

Granite Valley LRT

Project Assurance Overview

LIVE

86%

Req. Approved

91%

V&V Coverage

74%

Activities

Assurance by system

Traction Power62%
Signalling48%
Communications71%
Track83%

Upcoming witness points

12

3 due1 overdue

Evidence review

SAT-TP-001 / Exec #2Accepted
SAT-SIG-001 / Exec #1Review
INSP-TRK-001 / Exec #1Accepted

Assurance trace

REQ
V&V
ACT
PROC
EXEC
EVID

Built around the assurance lifecycle

More than a requirements register.

SeiaWorks connects the requirement baseline to V&V, execution, evidence, issue closure, RAM and Safety while keeping the engineering relationships visible.

01

Requirements

Control the engineering baseline

Capture requirements, manage exact versions and baselines, configure project attributes and track maturity as the project evolves.

02

Traceability

Understand how requirements connect

Maintain controlled requirement relationships and follow decomposition, allocation, derivation and impact across large project baselines.

03

V&V

Plan how every requirement will be proven

Use a lifecycle RTM that links requirements directly to controlled procedure capture, execution evidence and verification decisions.

04

Execution

Capture results where the work happens

Run approved procedures electronically with measurements, acceptance criteria, photos, attachments and preserved retest history.

05

Issues & FRACAS

Move findings through verified closure

Manage issues, corrective action and failure analysis without separating genuine failure events from the engineering issue lifecycle.

06

RAM

Turn operating data into assurance

Combine controlled RAM criteria, exposure and chargeable failure populations into transparent reliability and maintainability assessments.

07

Safety

Govern hazards through acceptance

Manage hazards, controls, risk assessments, evidence, independent review and formal acceptance in one controlled lifecycle.

08

Witness & Hold

Coordinate stakeholder participation

Track project-defined parties, notice periods, invitations, attendance and formal hold-point releases.

End-to-end traceability

Follow the assurance chain, not the folder structure.

Keep the controlled relationship between what was required, how it was planned to be verified, what was actually executed and the evidence that was produced.

Explore platform features
01

Requirement

02

V&V

03

Activity

04

Procedure

05

Execution

06

Evidence

07

Verification

The result

A defensible, reviewable project assurance record.

Electronic commissioning

Bring the controlled procedure into the field.

Execute the exact approved revision, capture typed results and measurements, collect evidence at the point of work and preserve every retest attempt.

Structured steps

Instructions, acceptance criteria, limits, units and response types.

Objective validation

Automatic pass/fail for measurements and controlled responses.

Photo evidence

Capture photos and attachments directly against the test step.

Retest history

Preserve failed attempts and link subsequent passing executions.

Electronic execution

SAT-TP-001 · Execution #2

Procedure Rev 4TPSS-013 requirements
2.1

DC bus voltage

Acceptance: 730–770 V DC

Recorded: 748 V DC

PASS
2.2

Feeder breaker local operation

Acceptance: Operates correctly

Recorded: Pass

PASS
3.1

SCADA breaker operation

Acceptance: Command + indication

Recorded: Pass

PASS

Execution → V&V evidence

Completed execution becomes a reviewable evidence package.

Step results, photos and attachments remain linked to the requirements they support.

One project record, different perspectives

Useful from the test team to project leadership.

SeiaWorks is being shaped around the real participants in complex infrastructure assurance, while keeping project-controlled access and authority boundaries explicit.

T&C teams

See what is ready, what needs testing, which procedure applies, what failed and what evidence was captured.

Systems & assurance

Maintain traceability from requirement through verification method, activity, execution and objective evidence.

Project leadership

See requirements maturity, V&V coverage and assurance delivery by system, activity and location.

Clients & independent assurance

Structured for future controlled access to upcoming testing, witness points, dashboards and narrowly scoped review actions.

Witness & hold point management

Know who needs notice, what is due and what is blocking progression.

Project-defined assurance parties and point types support notification tracking, optional witness attendance, formal hold releases and a central view of upcoming stakeholder involvement.

Notifications due3
Overdue1
Upcoming points12

Engineering clarity. Delivered.

Bring requirements, testing and evidence into the same assurance story.

Designed for complex infrastructure projects where traceability, controlled execution and visible progress matter.